LCC-Optimierung vom Feinsten

Startseite > Projekte > LCC-Optimierung vom Feinsten

An elastic track bearing system with optimal performance – economical, ecological, stray current insulating, good structure-borne sound insulatio, and long service life. LCC in perfection!

Our customer Leipziger Verkehrsbetriebe (LVB) was looking for a state-of-the-art track system with continuously elastic rail bearing that met the requirements for stray current insulation in accordance with DIN-EN 50122-2 and the reduction of structure-borne noise and vibrations. LVB therefore opted for our edilon)(sedra SDS (Sound Damping System) for the tram replacement project “Karl-Liebknecht-Straße” in Leipzig.

In addition to maintaining known principles and meeting the requirements of new standards, simple installation and a good price/performance ratio were also relevant for LVB when looking for a suitable system. A prerequisite for the selection of this system was the usability certificate according to DIN 45673-8 for the entire system. An innovative feature of the tram project in Leipzig was the use of prefabricated tie bars coated with PU foam, a joint development of the LVB and edilon)(sedra, which prevents cracking in the road surface.

A total of 2200 m of track and 3 switches were installed with the modular edilon)(sedra SDS, consisting of 100% recyclable edilon)(sedra Filler Blocks for which an official Environmental Product Declaration (EPD) has been issued. In combination with the plastic-based joint grouting, edilon)(sedra Jointelast PU Extra 25, which remains highly elastic even at low temperatures, the flank adhesion could be ensured with deflection of up to 0.9 mm. All the required measured values, both for vertical rail deflection and leakage current insulation, could be successfully demonstrated in practice. The edilon)(sedra SDS system has already proven itself for more than 8 years on Karl-Liebknecht-Straße in Leipzig.

Die Herausforderung

Development of a durable state-of-the art elastic track bearing system with proven fulfilment of requirements regarding rail deflection, structure-borne noise and vibrations, as well as stray current insulation.

Die Lösung

edilon)(sedra SDS (Sound Damping System)

Das Ergebnis

An environmentally friendly, durable, and economical elastic track bearing system.

Weitere Informationen?

Mit mehr als 50 Jahren Erfahrung im Bereich der Festen Fahrbahn verfügt unser qualifiziertes Team über fundierte Branchenkenntnisse, um den Erfolg Ihres Eisenbahnprojekts zu unterstützen und sicherzustellen.

Haben Fragen über Ihr Projekt, unsere Schienensysteme oder Mehrwertdienste?
Sie möchten den nächsten Schritt in Ihrer Karriere machen Karriere bei uns?
Bedarf Unterstützung mit etwas anderem?

Dieses Feld dient der Validierung und sollte unverändert bleiben.
Datenschutz(Erforderlich)